Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Mechanization cuts payroll, speeds construction of dam
Construction of 11 1/2 million yd embankment for 325 ft high Abiquiu dam; use of continuous-loading wheel excavator that fills 19 yd truck in less than 30 sec, 4320 ft long single belt conveyor that carries fill from borrow area to embankment site at rates of up to 3200 tph and device that automatically injects water into fill material to bring it up to optimum moisture for compaction; use of system that processes bulk borrow and classifies it into gravel, random, or core material.
Mechanization cuts payroll, speeds construction of dam
Construction of 11 1/2 million yd embankment for 325 ft high Abiquiu dam; use of continuous-loading wheel excavator that fills 19 yd truck in less than 30 sec, 4320 ft long single belt conveyor that carries fill from borrow area to embankment site at rates of up to 3200 tph and device that automatically injects water into fill material to bring it up to optimum moisture for compaction; use of system that processes bulk borrow and classifies it into gravel, random, or core material.
Mechanization cuts payroll, speeds construction of dam
Construction Methods Equipment
1962
5 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Mechanization speeds up milling-in-transit
Engineering Index Backfile | 1952
|Evaluating regional cuts in the payroll tax from a firm perspective
Online Contents | 2015
|Evaluating regional cuts in the payroll tax from a firm perspective
Online Contents | 2015
|Mechanization revolutionizes construction
Tema Archiv | 1974
UB Braunschweig