Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
New dike construction method on frozen muskeg at Calgary Power's combined storage and power project leaves muskeg in place and controls it; unfrozen fill is placed on frozen muskeg curbed by carefully constructed drainage ditch; 4 layers of fill are placed in stages, working actually from haul road, until 35-ft wide dike has reached required 40-ft height.
New dike construction method on frozen muskeg at Calgary Power's combined storage and power project leaves muskeg in place and controls it; unfrozen fill is placed on frozen muskeg curbed by carefully constructed drainage ditch; 4 layers of fill are placed in stages, working actually from haul road, until 35-ft wide dike has reached required 40-ft height.
Alberta's Brazeau dam takes shape
Eng Contract Rec
Gahbauer, S.F. (Autor:in)
1962
6 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Alberta's reclamation research program
British Library Conference Proceedings | 1992
|Online Contents | 2010
|Alberta's Largest Historic Landslide
British Library Conference Proceedings | 1995
|Alberta's sand-clay and earth roads
Engineering Index Backfile | 1927
|Alberta's Municipal Pavement Management System
British Library Conference Proceedings | 1994
|