Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Canadian, U.S. contractors built New Soo Bridge by cantilevering
Design and construction methods of new bridge crossing United States and Canadian border at Sault Ste. Marie; Canadian Bridge Works erected 2877 ft of 2-lane highway bridge on Canadian side and Bethlehem Steel Co erected 2662 ft on United States side; savings in weight by use of low alloy high strength steel ASTM designation A-44 0 instead of A-7 steel in highly stressed truss members and some floor beams.
Canadian, U.S. contractors built New Soo Bridge by cantilevering
Design and construction methods of new bridge crossing United States and Canadian border at Sault Ste. Marie; Canadian Bridge Works erected 2877 ft of 2-lane highway bridge on Canadian side and Bethlehem Steel Co erected 2662 ft on United States side; savings in weight by use of low alloy high strength steel ASTM designation A-44 0 instead of A-7 steel in highly stressed truss members and some floor beams.
Canadian, U.S. contractors built New Soo Bridge by cantilevering
Eng News-Rec
Engineering News-Record ; 169
1962
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
British Library Online Contents | 2001
|The Stolma Bridge - Free Cantilevering 301 meters Free Span with Pre-stressed Concrete Box Girder
British Library Conference Proceedings | 1999
|Steel arch bridge over Mersey has 330 m long span and 2 cantilevering side spans of 76 m length each
Engineering Index Backfile | 1961
|