Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Water supply of Hartford metropolitan district
History of water works serving population of over 200,000; construction of concrete core earth fill dam at Barkhamsted, having max height of 137 ft; population and water consumption statistics; rainfall, run-off and flood records; design of spillways; specifications for dam construction.
Water supply of Hartford metropolitan district
History of water works serving population of over 200,000; construction of concrete core earth fill dam at Barkhamsted, having max height of 137 ft; population and water consumption statistics; rainfall, run-off and flood records; design of spillways; specifications for dam construction.
Water supply of Hartford metropolitan district
Conn Soc Civ Engrs -- Annual Report
Saville, C.M. (Autor:in)
1935
51 pages
10 Supp Sheets
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
An Updated Hartford Metropolitan District Water Rate Survey
Wiley | 1976
|An Updated Hartford Metropolitan District Water Rate Survey
Wiley | 1978
|Precise survey of Hartford metropolitan district
Engineering Index Backfile | 1933
|Water supply tunnels of Boston metropolitan district
Engineering Index Backfile | 1949
|