Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Compaction of foundations under dams; study of cut-off grout curtains consisting of parallel rows of pressure grouted holes upstream of dam site; tests of effect of depth and distribution of holes on pressure and permeability; criterion for determining point at which grouting operations may be stopped.
Compaction of foundations under dams; study of cut-off grout curtains consisting of parallel rows of pressure grouted holes upstream of dam site; tests of effect of depth and distribution of holes on pressure and permeability; criterion for determining point at which grouting operations may be stopped.
Compaction of foundations under dams
Die Abdichtung des Untergrundes beim Talsperrenbau
Jaehde, H. (Autor:in)
Beton und Eisen ; 36
1937
6 pages
Aufsatz (Zeitschrift)
Deutsch
© Metadata Copyright Elsevier B. V. All rights reserved.
Seismic Response of Earth Dams on Liquefiable Foundations and Compaction Remediation
British Library Conference Proceedings | 2003
|TIBKAT | 1993
|Shale foundations for earth dams
Engineering Index Backfile | 1955
|Arch dam foundations: Appropriate foundations for arch dams
British Library Conference Proceedings | 1990
|Compaction of earth and rock-fill dams
Engineering Index Backfile | 1960
|