Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
New jetty, utilizing precast prestressed concrete construction, capable of handling coal ships up to 14,000 ton displacement is in operation at Erith, Kent; foundation consists of 72 prestressed concrete cylinders, with outside diam of 6 ft; cylinders are connected by main cross beams and covered by 7 in. thick concrete deck slab; three cranes have 200 ton capacity each; shock absorbing device consists of steel piles and rubber disks on steel plates.
New jetty, utilizing precast prestressed concrete construction, capable of handling coal ships up to 14,000 ton displacement is in operation at Erith, Kent; foundation consists of 72 prestressed concrete cylinders, with outside diam of 6 ft; cylinders are connected by main cross beams and covered by 7 in. thick concrete deck slab; three cranes have 200 ton capacity each; shock absorbing device consists of steel piles and rubber disks on steel plates.
Coal handling Jetty on Thames
World Construction
Heath, W.A. (Autor:in)
World Construction ; 11
1958
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
A new ferro-concrete coal jetty on the Thames
Engineering Index Backfile | 1906
Reinforced concrete jetty on the thames
Engineering Index Backfile | 1928
Jetty for large tankers on Thames
Engineering Index Backfile | 1952
New prestressed concrete jetty on Thames at Erith
Engineering Index Backfile | 1957
New prestressed concrete Jetty on Thames at Erith
Engineering Index Backfile | 1958