Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Stornorrfors: milestone in rock excavation history
Swedish project requires 2.2 million cu yd of underground rock excavation; in driving 1720 sq ft top heading of 51×85 ft high tailrace tunnel, tunnelers using one-man pusher-leg drills removed average of 38,100 cu ft of rock per day over full length of 2.5 mi heading; description of hydroelectric plant, discharge tunnel, tailrace and penstocks.
Stornorrfors: milestone in rock excavation history
Swedish project requires 2.2 million cu yd of underground rock excavation; in driving 1720 sq ft top heading of 51×85 ft high tailrace tunnel, tunnelers using one-man pusher-leg drills removed average of 38,100 cu ft of rock per day over full length of 2.5 mi heading; description of hydroelectric plant, discharge tunnel, tailrace and penstocks.
Stornorrfors: milestone in rock excavation history
Eng News-Rec
Goransson, T. (Autor:in)
Engineering News-Record ; 160
1958
3 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Rock foundation trench excavation device and excavation method
Europäisches Patentamt | 2024
|