Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Mast erection equipment for railway electrification
Equipment developed by BIC Construction Co built by Wharton Engineers (Elstree), in operation on main line project near Crewe; it is capable of installing 1 mi of masts for overhead conductor supports along one side of track in daily period of 6 hr, and consists of auger borer train, for making foundation holes, mast placing train, and concrete mixing and placing train.
Mast erection equipment for railway electrification
Equipment developed by BIC Construction Co built by Wharton Engineers (Elstree), in operation on main line project near Crewe; it is capable of installing 1 mi of masts for overhead conductor supports along one side of track in daily period of 6 hr, and consists of auger borer train, for making foundation holes, mast placing train, and concrete mixing and placing train.
Mast erection equipment for railway electrification
Engineer
Engineer ; 205
1958
4 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Reliability Quantification of Railway Electrification Mast Structure Considering Buckling
DOAJ | 2021
|Erection of 220 ft wireless mast
Engineering Index Backfile | 1940
Engineering Index Backfile | 1953