Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Contractor teams draglines with scrapers on toe drain
Sacramento River Channel Project called for 1,273,000 cu yd of semi-compacted levee and 3,850,000 cu yd of toe drain excavation; toe drain is 18.6 mi long, 41 ft wide at bottom and will be excavated to depth of 15 ft with 3-to-1 slope on its banks; use of draglines and scrapers is emphasized.
Contractor teams draglines with scrapers on toe drain
Sacramento River Channel Project called for 1,273,000 cu yd of semi-compacted levee and 3,850,000 cu yd of toe drain excavation; toe drain is 18.6 mi long, 41 ft wide at bottom and will be excavated to depth of 15 ft with 3-to-1 slope on its banks; use of draglines and scrapers is emphasized.
Contractor teams draglines with scrapers on toe drain
Pac Bldr Engr
1958
2 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Draglines and pavers build storm drain
Engineering Index Backfile | 1929
Tema Archiv | 1994
|Beherrschung neuer raupenfahrbarer Draglines
Tema Archiv | 2002
|Engineering Index Backfile | 1904
|Engineering Index Backfile | 1947