Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Concrete methods at Bhakra Dam and power plant
Some of details of foundation concreting and construction of main dam and power plant which involved 175,000 cu yd per mo operation; most difficult problem was concreting heel clay stone and strata; techniques used are reviewed.
Concrete methods at Bhakra Dam and power plant
Some of details of foundation concreting and construction of main dam and power plant which involved 175,000 cu yd per mo operation; most difficult problem was concreting heel clay stone and strata; techniques used are reviewed.
Concrete methods at Bhakra Dam and power plant
World Construction
World Construction ; 11
1958
3 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1964
|Engineering Index Backfile | 1954
Structural behaviour of Bhakra dam
Engineering Index Backfile | 1967
|Bhakra-Nangal project in Punjab
Engineering Index Backfile | 1951
Engineering Index Backfile | 1955
|