Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Construction of Courtright and Wishon rock fill dams, Calif; Courtright is 310 ft high from bedrock foundation, Wishon 290 ft; big rocks handled without cable slings; slip-form method used for concreting upstream dam face; improved ammonium nitrate blasting technique; concreting work detailed.
Construction of Courtright and Wishon rock fill dams, Calif; Courtright is 310 ft high from bedrock foundation, Wishon 290 ft; big rocks handled without cable slings; slip-form method used for concreting upstream dam face; improved ammonium nitrate blasting technique; concreting work detailed.
Joint venture group pushes dam project
Excavating Engr
Day, R. (Autor:in)
Excavating Engineer ; 52
1958
2 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
PWA pushes Cleveland housing project
Engineering Index Backfile | 1936
SGL Group buys out joint venture
British Library Online Contents | 2018
Saudi Arabia pushes on with expansion project
IuD Bahn | 2006
|Exploration Roundup: Joint Venture Will Develop Selwyn Project
Online Contents | 2010
River Eider Project: A Feather in Joint Venture Cap
Online Contents | 1994