Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Casitas Dam gives this classifying system workout
New concept in coarse materials handling and sizing was tried in construction of Casitas Dam near Oak View, Calif; pair of " wobbler" feeders was installed for earth fill dam which requires that about 4 million cu yd of rock products, sand, gravel, boulders and clay be separated at 3-in. size; each wobbler-feeder is made up of 16 parallel ribbed elliptical manganese steel bars, in bottom of truck dump hopper.
Casitas Dam gives this classifying system workout
New concept in coarse materials handling and sizing was tried in construction of Casitas Dam near Oak View, Calif; pair of " wobbler" feeders was installed for earth fill dam which requires that about 4 million cu yd of rock products, sand, gravel, boulders and clay be separated at 3-in. size; each wobbler-feeder is made up of 16 parallel ribbed elliptical manganese steel bars, in bottom of truck dump hopper.
Casitas Dam gives this classifying system workout
Rock Products
Rock Products ; 61
1958
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
British Library Online Contents | 1997
|Online Contents | 1997
|British Library Online Contents | 1993
|