Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Glenbawn dam [midline ellipsis] construction recently completed
Construction work completed on Glenbawn dam, major structure in scheme for control and development of Hunter river valley in New South Wales; height 251 ft, crest length 2700 ft; dam contains 10 million cu yd of fill material; soil testing, foundation grouting, embankment behavior, and outlets described; discharge capacity of spillway 60,000 cusecs, corresponding flood peak rate of 220,000 cusecs.
Glenbawn dam [midline ellipsis] construction recently completed
Construction work completed on Glenbawn dam, major structure in scheme for control and development of Hunter river valley in New South Wales; height 251 ft, crest length 2700 ft; dam contains 10 million cu yd of fill material; soil testing, foundation grouting, embankment behavior, and outlets described; discharge capacity of spillway 60,000 cusecs, corresponding flood peak rate of 220,000 cusecs.
Glenbawn dam [midline ellipsis] construction recently completed
Commonwealth Engr
1958
3 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Weather [midline ellipsis] waves [midline ellipsis] and offshore oil
Engineering Index Backfile | 1957
|Roadbuilding [midline ellipsis] 1939 accomplishments [midline ellipsis] 1940 budgets and outlook
Engineering Index Backfile | 1940
[midline ellipsis] for duration
Engineering Index Backfile | 1942
Engineering Index Backfile | 1945