Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Major factors affecting chemical plant construction costs; use of these factors in process design to control costs; types of contracts available, how contractor breaks down engineering information, how equipment is erected, and how to write specifications for contractor.
Major factors affecting chemical plant construction costs; use of these factors in process design to control costs; types of contracts available, how contractor breaks down engineering information, how equipment is erected, and how to write specifications for contractor.
Design for low construction costs
Chem Eng
Rohrdanz, R.C. (Autor:in)
Chemical Engineering ; 65
1958
5 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Design Error Costs in Construction Projects
ASCE | 2011
|Design Error Costs in Construction Projects
British Library Online Contents | 2012
|Design Error Costs in Construction Projects
Online Contents | 2012
|Effect of design on construction costs
Engineering Index Backfile | 1952
Engineering Index Backfile | 1936