Merdeka bridge, Singapore: investigation, design, and construction
Site was in swamp and foundations were extremely poor; bridge has 25 80-ft spans; bund was constructed along center line and bridge built "in dry": hollow piers and precast post-tensioned main beams with post-tensioned transversely prestressed deck system adopted; precast A frames with cast-in-situ sheathing walls form piers; beam test to destruction and test to determine lateral distribution of loads on finished span.
Merdeka bridge, Singapore: investigation, design, and construction
Site was in swamp and foundations were extremely poor; bridge has 25 80-ft spans; bund was constructed along center line and bridge built "in dry": hollow piers and precast post-tensioned main beams with post-tensioned transversely prestressed deck system adopted; precast A frames with cast-in-situ sheathing walls form piers; beam test to destruction and test to determine lateral distribution of loads on finished span.
Merdeka bridge, Singapore: investigation, design, and construction
Instn Civ Engrs -- Proc
Hollis-Bee, R.J. (Autor:in)
1958
34 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Upgrading of Bridges - Merdeka Bridge Experience
British Library Conference Proceedings | 1995
|Precast concrete construction: Bridge construction in Singapore
British Library Online Contents | 2002
|PRODUCTION - Precast concrete construction: Bridge construction in Singapore
Online Contents | 2002
|