440 ft long four span continuous T girder structure has 48 ft wide roadway and 6 ft sidewalks; after completing formwork, falsework, and steel placing, cement was poured in one continuous operation; 2200 cu yd of cement poured in 55 hr, 40 cu yd per hr; 1 yd capacity crane, 10 electric vibrators used; two temporary runways, 5 ft wide were erected full length of structure.
440 ft long four span continuous T girder structure has 48 ft wide roadway and 6 ft sidewalks; after completing formwork, falsework, and steel placing, cement was poured in one continuous operation; 2200 cu yd of cement poured in 55 hr, 40 cu yd per hr; 1 yd capacity crane, 10 electric vibrators used; two temporary runways, 5 ft wide were erected full length of structure.
Planning Wharncliffe bridge pour
Eng Contract Rec
Heffernan, J.J. (Autor:in)
1958
3 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
British Library Online Contents | 2009
|Careful planning features bridge job
Engineering Index Backfile | 1948
|Planning arc welded bridge construction
Engineering Index Backfile | 1935
|Urban Freeway Bridge Reconstruction Planning: Case of Mockingbird Bridge
British Library Online Contents | 2000
|Bridge Seismic Retrofit Planning Program
NTIS | 1991
|