Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Paving of 555,000 cu yd at Beale Air Force Base, Calif; runways have slab of concrete with minimum thickness of 20 in., and they are 12, 000 ft long; 5,000,000 cu yd of excavation and fill was necessary; average daily pour is 4800 cu yd of concrete; methods and equipment used.
Paving of 555,000 cu yd at Beale Air Force Base, Calif; runways have slab of concrete with minimum thickness of 20 in., and they are 12, 000 ft long; 5,000,000 cu yd of excavation and fill was necessary; average daily pour is 4800 cu yd of concrete; methods and equipment used.
King-sized hurry-up paving job
Pac Bldr Engr
Ross, F.K. (Autor:in)
1958
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Online Contents | 2004
Hurry-up flood control channel
Engineering Index Backfile | 1957
|Engineering Index Backfile | 1919
|Building 2000 ft of wall in hurry
Engineering Index Backfile | 1949
|How to build Earth Dam in Hurry
Engineering Index Backfile | 1955