Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Features of new regulating gates for dam built on Richelieu River flowing from Lake Champlain to Sorel on St. Lawrence; gates are reinforced with steel ribs and are watertight; gates were built up in sections by Canadian Vickers in Montreal and then shipped to site; they are operated by water pressure instead of motor; as water is pumped into them they close; they open when empty; dam is 42 ft high; it consists of six pillars and five foundation rafts; pillars are 115 ft, center to center and clear space in between is 100 ft wide; dam has five 100-ft gates. (02268)
Features of new regulating gates for dam built on Richelieu River flowing from Lake Champlain to Sorel on St. Lawrence; gates are reinforced with steel ribs and are watertight; gates were built up in sections by Canadian Vickers in Montreal and then shipped to site; they are operated by water pressure instead of motor; as water is pumped into them they close; they open when empty; dam is 42 ft high; it consists of six pillars and five foundation rafts; pillars are 115 ft, center to center and clear space in between is 100 ft wide; dam has five 100-ft gates. (02268)
Water-operated gates will regulate river
Eng Contract Rec
Roesler, M. (Autor:in)
1968
2 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Hydraulically operated lock gates at meppen, dortmund-ems canal
Engineering Index Backfile | 1909
Spillway gates : will they open safely?
British Library Conference Proceedings | 1997
|Swiss automatic gates will guard Wissota dam
Engineering Index Backfile | 1916
Electrically operated weir on river thames
Engineering Index Backfile | 1954
Attempts to regulate the river Loire
Engineering Index Backfile | 1907
|