Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Description of methods of using armor piercing shells for loosening compactly cemented slag for construction of vital road in Far East; method, carried out by Seabees, proved to be successful; average of 20 holes per day brought down material for three shovels working full 24-hr day.
Description of methods of using armor piercing shells for loosening compactly cemented slag for construction of vital road in Far East; method, carried out by Seabees, proved to be successful; average of 20 holes per day brought down material for three shovels working full 24-hr day.
Blast holes shot into volcanic slag
Civ Eng (NY)
Cunney, G.A. (Autor:in)
1946
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1935
|Blast-furnace slag and slag cement
Engineering Index Backfile | 1886
|Engineering Index Backfile | 1945
Engineering Index Backfile | 1961
|Engineering Index Backfile | 1950
|