Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Four-lane highway construction on el camino real in Monterey County
Illustrated description of correction of congested section of highway between Santa Rita and 0.8 mi north of Crazy Horse Summit in Monterey County, Cal; construction crosses several unstable marshy areas; unstable material was excavated to underlying hard pan, 8 in. perforated metal pipe underdrains were installed and granular material was backfilled; data on other details of construction.
Four-lane highway construction on el camino real in Monterey County
Illustrated description of correction of congested section of highway between Santa Rita and 0.8 mi north of Crazy Horse Summit in Monterey County, Cal; construction crosses several unstable marshy areas; unstable material was excavated to underlying hard pan, 8 in. perforated metal pipe underdrains were installed and granular material was backfilled; data on other details of construction.
Four-lane highway construction on el camino real in Monterey County
Calif Highways Pub Works
Pearson, V.E. (Autor:in)
1946
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Sea Ranch, Sonoma County. Monterey Bay Aquarium, Monterey
Online Contents | 1994
|Camino Penstock Stabilization, El Dorado County, California
British Library Conference Proceedings | 2000
|Construction of a Four-Lane Highway Embankment over a Contaminated Landfill
British Library Conference Proceedings | 1993
|Reconstruction of El Camino real, San Francisco
Engineering Index Backfile | 1928
|Constructing four-lane highway in tight quarters
Engineering Index Backfile | 1961
|