Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Concrete pipe sections jacked vertically provide machinery foundations
Large, 5-ft diam concrete pipe was forced down by jacking against frame of building to permit construction of machinery foundation below that of building; by excavating inside pipe, four casings were put down 12 ft at cost of $433; illustrated description of procedure. (See also Eng News-Rec v 136 n 22 May 30 1946 p 856-7)
Concrete pipe sections jacked vertically provide machinery foundations
Large, 5-ft diam concrete pipe was forced down by jacking against frame of building to permit construction of machinery foundation below that of building; by excavating inside pipe, four casings were put down 12 ft at cost of $433; illustrated description of procedure. (See also Eng News-Rec v 136 n 22 May 30 1946 p 856-7)
Concrete pipe sections jacked vertically provide machinery foundations
Engineer
Hoffmier, J.D. (Autor:in)
Engineer ; 182
1946
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Concrete pipe sections jacked vertically provide machinery foundations
Engineering Index Backfile | 1946
|10-Ft-OD concrete pipe is jacked without spalling
Engineering Index Backfile | 1964
Tunnelled-cum-pipe jacked solution
Tema Archiv | 1992
|Jacked steel pipe piles in underpinning
British Library Conference Proceedings | 1998
|Pipe jacked solution for Parisian sewer
Online Contents | 1993
|