Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Deep cutoff trench of puddled clay for earth dam and levee protection
Illustrated description of new method of preventing both through-seepage and under-seepage in earth levees and dams by sealing deep cutoff trench with clay slurry and backfilling it with puddled clay; full-scale field test by U S Army engineers demonstrated effectiveness of new method.
Deep cutoff trench of puddled clay for earth dam and levee protection
Illustrated description of new method of preventing both through-seepage and under-seepage in earth levees and dams by sealing deep cutoff trench with clay slurry and backfilling it with puddled clay; full-scale field test by U S Army engineers demonstrated effectiveness of new method.
Deep cutoff trench of puddled clay for earth dam and levee protection
Eng News -- Rec
Kramer, H. (Autor:in)
Engineering News-Record ; 136
1946
5 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Puddled-clay cutoff walls stop sea-water infiltration
Engineering Index Backfile | 1951
|Accident and reconstruction of a clay Puddled dam
Engineering Index Backfile | 1918
|Levee Rehabilitation, Lower Wood River — East Alton Il. - Deep Cutoff Wall
British Library Conference Proceedings | 2017
|The Miller City Levee Break and Incipient Meander Cutoff
British Library Conference Proceedings | 1994
|