Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Accurate and continuous horizontal control was essential during construction of Shasta concrete gravity dam, key structure of Central Valley Project in California; illustrated description of control targets, triangulation points, markers and locating blocks.
Accurate and continuous horizontal control was essential during construction of Shasta concrete gravity dam, key structure of Central Valley Project in California; illustrated description of control targets, triangulation points, markers and locating blocks.
Horizontal control at Shasta dam
Western Construction News
Hirst, C.M. (Autor:in)
1946
2 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1944
|Engineering Index Backfile | 1938
|Engineering Index Backfile | 1943
|Shasta dam construction layout
Engineering Index Backfile | 1940
Engineering Index Backfile | 1943
|