Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Calaveras cement company adds third kiln
Illustrated description of Allis-Chalmers kiln at cement plant near San Andreas, Calif; method of returning Cottrell dust to kiln; feed control is development of Allis-Chalmers known as "synchronous tie".
Calaveras cement company adds third kiln
Illustrated description of Allis-Chalmers kiln at cement plant near San Andreas, Calif; method of returning Cottrell dust to kiln; feed control is development of Allis-Chalmers known as "synchronous tie".
Calaveras cement company adds third kiln
Concrete
Concrete ; 54
1946
2 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Calaveras hydraulic fill earth dam
Engineering Index Backfile | 1917
|Engineering Index Backfile | 1929
|Reconstructing the Calaveras dam by dry fill
Engineering Index Backfile | 1926
|Failure of part of the Calaveras dam
Engineering Index Backfile | 1918
Mining methods at Carson hill mine, Calaveras County, Calif.
Engineering Index Backfile | 1937