Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Modified Bailey bridge trusses provide temporary river crossing
Eight lines of Bailey trusses were assembled on shore in two sections, swung into position with shore-based guy derrick and decked with timber to provide 100-ft span, two-lane highway bridge over Patoka River in southwestern Indiana; bridge was completed in 48 days to serve as temporary crossing, following collapse of 68-year-old pin-connected truss bridge.
Modified Bailey bridge trusses provide temporary river crossing
Eight lines of Bailey trusses were assembled on shore in two sections, swung into position with shore-based guy derrick and decked with timber to provide 100-ft span, two-lane highway bridge over Patoka River in southwestern Indiana; bridge was completed in 48 days to serve as temporary crossing, following collapse of 68-year-old pin-connected truss bridge.
Modified Bailey bridge trusses provide temporary river crossing
Eng News-Rec
Allen, G.H. (Autor:in)
Engineering News-Record ; 137
1946
2 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Europäisches Patentamt | 2023
|Extra trusses added to Indus river bridge
Engineering Index Backfile | 1933
|Method and system for protecting cable by Bailey trusses
Europäisches Patentamt | 2020
|Engineering Index Backfile | 1944
|Engineering Index Backfile | 1944
|