Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Demolition of Waterloo temporary bridge
Illustrated report on demolition of bridge in London, England; steel lattice girder about 1500 ft in length mostly with timber piled supports and four steel cylinders filled with concrete; report includes data on superstructure and substructure, procedure of demolition, extraction of piles, removal of concrete, types and operation of equipment, etc. (See also - discussion n 8 Aug p 429-39)
Demolition of Waterloo temporary bridge
Illustrated report on demolition of bridge in London, England; steel lattice girder about 1500 ft in length mostly with timber piled supports and four steel cylinders filled with concrete; report includes data on superstructure and substructure, procedure of demolition, extraction of piles, removal of concrete, types and operation of equipment, etc. (See also - discussion n 8 Aug p 429-39)
Demolition of Waterloo temporary bridge
Structural Engr
Lind, H.P.T. (Autor:in) / Alderman, P.R. (Autor:in) / Wilmers, J.J. (Autor:in)
Structural Engineer ; 24
1946
22 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1936
|Engineering Index Backfile | 1936
|Engineering Index Backfile | 1936
|Engineering Index Backfile | 1936
|Engineering Index Backfile | 1936
|