Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Construction of coronation bridge of Tista river, North Bengal, India
Work described from contractor's point of view; main arch has span of 276 ft; cantilever construction was adopted but it was practicable to use this method up to certain point only, leaving central gap of 120 ft; this was closed by means of steel framed Melan arch springing from seatings at ends of cantilevers. (see also abstract in Surveyor v 105 n 2836 May 31 1946 p 425-6)
Construction of coronation bridge of Tista river, North Bengal, India
Work described from contractor's point of view; main arch has span of 276 ft; cantilever construction was adopted but it was practicable to use this method up to certain point only, leaving central gap of 120 ft; this was closed by means of steel framed Melan arch springing from seatings at ends of cantilevers. (see also abstract in Surveyor v 105 n 2836 May 31 1946 p 425-6)
Construction of coronation bridge of Tista river, North Bengal, India
Instn Civ Engrs -- J
Sexton, C.G. (Autor:in)
1946
13 pages
2 Supp plates
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Construction of coronation bridge of Tista river, North Bengal, India
Engineering Index Backfile | 1946
|Elsevier | 2023
|Reconstruction of Inchcape bridge, Bengal and North Western Railway
Engineering Index Backfile | 1938
|Reconstruction of Inchcape bridge, Bengal and North Western Railway
Engineering Index Backfile | 1938
|