Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Tunnel looped under a fault
Construction of subaqueous sewer tunnel under East River, New York City, for Wards Island 180 mgd sewage plant; bad rock first struck by New York sewer tunnel bypassed by sinking subshafts and dropping center section 220 ft lower; driving bore; lining methods; supervision.
Tunnel looped under a fault
Construction of subaqueous sewer tunnel under East River, New York City, for Wards Island 180 mgd sewage plant; bad rock first struck by New York sewer tunnel bypassed by sinking subshafts and dropping center section 220 ft lower; driving bore; lining methods; supervision.
Tunnel looped under a fault
Eng News-Rec
Engineering News-Record ; 119
1937
5 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Multi‐Input Source, Looped Systems
Wiley | 2008
|Single‐Input Source, Looped Systems
Wiley | 2008
|