Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Man-hour costs on grade separation contract
Man-hours and costs; construction of grade separation involving two plate girder spans carrying individual railroad tracks across depressed highway in Mid-Western state.
Man-hour costs on grade separation contract
Man-hours and costs; construction of grade separation involving two plate girder spans carrying individual railroad tracks across depressed highway in Mid-Western state.
Man-hour costs on grade separation contract
Construction Methods Equipment
1937
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Man-hour employment records for four grade separations
Engineering Index Backfile | 1937
Man-hour employment records for four grade separations
Engineering Index Backfile | 1937
Modelling Costs of Service Contract
Springer Verlag | 2013
|Performance-Based Contract Slashes Bridge Rehab Costs
Online Contents | 1993
Distribution of construction costs on contract work
Engineering Index Backfile | 1935