Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Large steel penstock placed in tunnel at Fort Peck
Design and erection of steel pipe, 24 ft 8 in. in diam, inside of outlet half of Tunnel No. 1 on Fort Peck project; fabrication and assembly; concrete placement; construction of drains; painting. (See also Eng News-Rec v 118 n 19 May 13 1937 p 693-6)
Large steel penstock placed in tunnel at Fort Peck
Design and erection of steel pipe, 24 ft 8 in. in diam, inside of outlet half of Tunnel No. 1 on Fort Peck project; fabrication and assembly; concrete placement; construction of drains; painting. (See also Eng News-Rec v 118 n 19 May 13 1937 p 693-6)
Large steel penstock placed in tunnel at Fort Peck
Genie Civil
Pence, A.W. (Autor:in)
Genie Civil ; 111
1937
2 pages
Aufsatz (Zeitschrift)
Französisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Large steel penstock placed in tunnel at Fort Peck
Engineering Index Backfile | 1937
|Enamel melted electricaly for penstock of Fort Peck dam
Engineering Index Backfile | 1938
|Fort Peck Project - Power Plant No. 1 Penstock Replacement
British Library Conference Proceedings | 1993
|ASCE | 2021
|Engineering Index Backfile | 1942
|