Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Freezing arch across toe of east forebay slide, Grand Coulee Dam
Freezing arch of water soaked silt across rock gorge to check lava-like flow of pitside earth in excavation for part of rock foundation for Grand Coulee dam; basic assumptions for computing ice dam resistance and details of freezing. (See also Reclamation Era v 27 n 1 Jan 1937 p 12-6)
Freezing arch across toe of east forebay slide, Grand Coulee Dam
Freezing arch of water soaked silt across rock gorge to check lava-like flow of pitside earth in excavation for part of rock foundation for Grand Coulee dam; basic assumptions for computing ice dam resistance and details of freezing. (See also Reclamation Era v 27 n 1 Jan 1937 p 12-6)
Freezing arch across toe of east forebay slide, Grand Coulee Dam
Eng News-Rec
Gordon, G. (Autor:in)
Engineering News-Record ; 118
1937
5 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Freezing arch across toe of east forebay slide, Grand Coulee Dam
Engineering Index Backfile | 1937
|Problems of slide control handled at grand coulee
Engineering Index Backfile | 1940
Multiple-arch bridge over spillway of grand coulee dam
Engineering Index Backfile | 1944
|Engineering Index Backfile | 1938