Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Hand placed rock filled dam on Hong Kong river in China 625 ft high from datum and 700 ft long is composite structure of five portions, cut off wall, diaphragm of concrete slabs, thrust block, rock fill, and sand wedge.
Hand placed rock filled dam on Hong Kong river in China 625 ft high from datum and 700 ft long is composite structure of five portions, cut off wall, diaphragm of concrete slabs, thrust block, rock fill, and sand wedge.
Flexible face for rock-fill dam
Water Works Eng
Gourley, H.J.F. (Autor:in)
1937
3 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Europäisches Patentamt | 2021
|Research and Application on Concrete Face Rock-Fill Dam’s Earth-Rock Allocation
Trans Tech Publications | 2014
|High rock-fill dam designed with jointed concrete face
Engineering Index Backfile | 1930
|Research and Application on Concrete Face Rock-Fill Dam's Earth-Rock Allocation
British Library Conference Proceedings | 2014
|Base concrete face rock fill dam and construction method thereof
Europäisches Patentamt | 2016
|