Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
May 8: Design and construction of welded plate girder bridge consisting of three spans 63 m to 99 m long, carrying German superhighway over Oder River, near Stettin. (see also English abstract in Civ Eng (Lond) v 32 n 373 July 1937 p 242)
May 8: Design and construction of welded plate girder bridge consisting of three spans 63 m to 99 m long, carrying German superhighway over Oder River, near Stettin. (see also English abstract in Civ Eng (Lond) v 32 n 373 July 1937 p 242)
Die Oderbruecke im Zuge der Reichsautobahn Berlin -- Stettin
Die Oderbruecke im Zuge der Reichsautobahn Berlin -- Stettin
Worch, G. (Autor:in)
Bauingenieur ; 18
1937
6 pages
Aufsatz (Zeitschrift)
Deutsch
© Metadata Copyright Elsevier B. V. All rights reserved.
Die Oderbrücke im Zuge der Reichsautobahn Berlin-Stettin
UB Braunschweig | 1937
|Die Oderbruecke im Zuge der Reichsautobahn Berlin -- Stettin
Engineering Index Backfile | 1937
|Die Oderbruecke im Zuge der Reichsautobahn Berlin -- Stettin
Engineering Index Backfile | 1937
|Die Oderbrücke im Zuge der Reichsautobahn Berlin-Stettin
TIBKAT | 1937
|Bereitstellung der Baustoffe fuer die Betondecken der Reichsautobahn Berlin -- Stettin
Engineering Index Backfile | 1938
|