Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Movement of Boulder dam due to grouting
Measurements of block deflections caused by grouting of vertical joints; precautions taken to check excessive movements; deflection curves plotted directly from gage readings; description of cooling system used to dissipate heat liberated by setting of concrete.
Movement of Boulder dam due to grouting
Measurements of block deflections caused by grouting of vertical joints; precautions taken to check excessive movements; deflection curves plotted directly from gage readings; description of cooling system used to dissipate heat liberated by setting of concrete.
Movement of Boulder dam due to grouting
Civ Eng (NY)
Simonds, A.W. (Autor:in)
1937
4 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1936
|Grouting foundations of Boulder Dam
Engineering Index Backfile | 1936
|Designs for grouting at Boulder dam
Engineering Index Backfile | 1936
|Extensive rock grouting at Boulder dam
Engineering Index Backfile | 1935
Grouting contraction joints at Boulder dam
Engineering Index Backfile | 1937
|