Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Point of discharge; number of outlets; influence of coast line; storage; treatment of solids; chlorination before discharge; "tailings" difficulty; inexperienced contractor; contractor as agent; winter work; supervision. Before Instn Sanitary Engrs.
Point of discharge; number of outlets; influence of coast line; storage; treatment of solids; chlorination before discharge; "tailings" difficulty; inexperienced contractor; contractor as agent; winter work; supervision. Before Instn Sanitary Engrs.
Disposal of sewage of seaside towns
Surveyor
Taylor, G.M.C. (Autor:in)
1934
3 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Sewage disposal of seaside and tidal towns
Engineering Index Backfile | 1910
|Engineering Index Backfile | 1928
|Design of a sewage disposal scheme for a seaside town
Engineering Index Backfile | 1911
|New report calls for revival of British seaside towns
British Library Online Contents | 2013
Economic Change and the Labour Market in Britain’s Seaside Towns
Taylor & Francis Verlag | 2004
|