Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
The Milwaukee water works intake
Full description of this difficult and important work, recently completed in the face of serious impediments. Consists of tunnel 3200 feet long at shore end; then 5000 feet of submerged pipe, extending to an intake crib.
The Milwaukee water works intake
Full description of this difficult and important work, recently completed in the face of serious impediments. Consists of tunnel 3200 feet long at shore end; then 5000 feet of submerged pipe, extending to an intake crib.
The Milwaukee water works intake
Eng News
1895
Illustrated
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Milwaukee city water works' new intake
Engineering Index Backfile | 1892
Linwood avenue tunnel Milwaukee Water Works
Engineering Index Backfile | 1921
Construction plant and methods employed on new water works intake tunnel at Milwaukee, Wis.
Engineering Index Backfile | 1915
Tunnel intake for Milwaukee waterworks
Engineering Index Backfile | 1914
|Sewerage of Milwaukee, and the Milwaukee River flushing works
Engineering Index Backfile | 1893
|