Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Aluminium footbridge at Pitlochry
Bridge 310 ft 6 in. long overall, with center span of 172 ft 6 in. and two side spans each of 69 ft; built for North of Scotland Hydro-Electric Board as one of ancillary works of Tummel-Garry hydroelectric scheme; riveting problems and erection methods.
Aluminium footbridge at Pitlochry
Bridge 310 ft 6 in. long overall, with center span of 172 ft 6 in. and two side spans each of 69 ft; built for North of Scotland Hydro-Electric Board as one of ancillary works of Tummel-Garry hydroelectric scheme; riveting problems and erection methods.
Aluminium footbridge at Pitlochry
Engineer
Engineer ; 190
1950
3 pages
Illustrations
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1957
Innovative Footbridge in Seoul -Seonyu Footbridge
British Library Conference Proceedings | 2002
|Innovative Footbridge in Seoul -Seonyu Footbridge
British Library Conference Proceedings | 2002
|Pitlochry Dam - the use of post-tensioned ground anchors to increase stability
British Library Conference Proceedings | 1994
|