Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Features of floodlighting installation at Kezar Stadium, San Francisco; chemical solidification of foundation soil, to permit excavation of pier footings without shoring, was used for six 136-ft high floodlight towers. (see also Elec West v 104 n 1 Jan 1950 p 72)
Features of floodlighting installation at Kezar Stadium, San Francisco; chemical solidification of foundation soil, to permit excavation of pier footings without shoring, was used for six 136-ft high floodlight towers. (see also Elec West v 104 n 1 Jan 1950 p 72)
New tower installation technique
Elec Construction Maintenance
Bristow, T.G. (Autor:in)
1950
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
New tower installation technique
Engineering Index Backfile | 1950
|TOWER ERECTION SYSTEM AND TOWER ERECTION INSTALLATION METHOD
Europäisches Patentamt | 2022
|