Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Earth dam "B", 45 ft high above river bed, requires moving 868,111 cu yd earth, and placing 43,430 cu yd concrete in river channel; illustrated data on construction including driving of 2127 H piles for spillway structure.
Earth dam "B", 45 ft high above river bed, requires moving 868,111 cu yd earth, and placing 43,430 cu yd concrete in river channel; illustrated data on construction including driving of 2127 H piles for spillway structure.
First dam on Neches
Excavating Engr
London, E.F. (Autor:in)
Excavating Engineer ; 44
1950
2 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Salinity modelling for the Sabine-Neches Estuary, Southeast Texas
British Library Online Contents | 2001
|Construction canals serve builders of Neches River Bridge
Engineering Index Backfile | 1938
Construction canals serve builders of Neches River Bridge
Engineering Index Backfile | 1938