Concreting begins at Hungry Horse dam
Illustrated description of aggregate handling at dam and facilities for mixing and transporting concrete which are designed to permit placing of as much as 320 cu yd per hour during working season; total of 2,900,000 cu yd to be placed; concrete work will be keyed to requirement of having 1,000,000 acre-ft of usable storage after 1952 runoff. (See also Eng News-Rec v 143 n 23 Dec 22 1949 p 31-4; Construction Methods and Equipment v 31 n 12 Dec 1949 p 50-5, 92, v 32 n 2 Feb 1950 p 56-7, 60-1, 64)
Concreting begins at Hungry Horse dam
Illustrated description of aggregate handling at dam and facilities for mixing and transporting concrete which are designed to permit placing of as much as 320 cu yd per hour during working season; total of 2,900,000 cu yd to be placed; concrete work will be keyed to requirement of having 1,000,000 acre-ft of usable storage after 1952 runoff. (See also Eng News-Rec v 143 n 23 Dec 22 1949 p 31-4; Construction Methods and Equipment v 31 n 12 Dec 1949 p 50-5, 92, v 32 n 2 Feb 1950 p 56-7, 60-1, 64)
Concreting begins at Hungry Horse dam
Pac Bldr Engr
1950
3 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Concreting begins at Hungry Horse dam
Engineering Index Backfile | 1949
Concreting begins at Hungry Horse dam
Engineering Index Backfile | 1950
Concreting methods at Hungry Horse
Engineering Index Backfile | 1950