Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Longest continuous prestressed girders carry sclayn bridge traffic over Meuse river
Bridge is two-span structure of 412 ft total length; initial prestressing force 12,600,000 lb; total cost of prestressing labor was less than 1% of cost of bridge; work stages illustrated.
Longest continuous prestressed girders carry sclayn bridge traffic over Meuse river
Bridge is two-span structure of 412 ft total length; initial prestressing force 12,600,000 lb; total cost of prestressing labor was less than 1% of cost of bridge; work stages illustrated.
Longest continuous prestressed girders carry sclayn bridge traffic over Meuse river
Civ Eng (NY)
Magnel, G. (Autor:in)
1950
2 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Prestressed steel girders carry prestressed concrete floor
Engineering Index Backfile | 1964
Longest continuous prestressed concrete bridge in Australia
Engineering Index Backfile | 1957
Germany's longest prestressed bridge
Engineering Index Backfile | 1960
Bridges on SP cut-off include 'longest' prestressed girders
Engineering Index Backfile | 1967
Revin-Orzy bridge over Meuse river
Engineering Index Backfile | 1963
|