Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Ford avenue bascule bridge jacked up 7 1/2 ft in four days
Bridge of 220 ft clear span in Los Angeles and Long Beach harbor area had settled 5 ft was lifted by hydraulic jacks; illustrated description of procedure. See also Engineering Index 1949 p 136.
Ford avenue bascule bridge jacked up 7 1/2 ft in four days
Bridge of 220 ft clear span in Los Angeles and Long Beach harbor area had settled 5 ft was lifted by hydraulic jacks; illustrated description of procedure. See also Engineering Index 1949 p 136.
Ford avenue bascule bridge jacked up 7 1/2 ft in four days
Civ Eng (NY)
Annin, R.H. (Autor:in)
1950
3 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Bascule bearings jacked to position
Engineering Index Backfile | 1948
|Restoring the Michigan Avenue Bascule Bridge
British Library Conference Proceedings | 1995
|The Michigan avenue bascule bridge, Buffalo
Engineering Index Backfile | 1897
The ashland avenue bascule bridge, Chicago
Engineering Index Backfile | 1903
Substructure of Michigan avenue Bascule Bridge, Chicago
Engineering Index Backfile | 1919
|