Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Maintaining 48-inch main laid across swamp
Illustrated description of 48-in. steel main laid by New York City Water Department across swamp area in 1937; technical details of pipe construction and insulation; main is supported by reinforced concrete beams, stringers and cradles resting on wooden piles.
Maintaining 48-inch main laid across swamp
Illustrated description of 48-in. steel main laid by New York City Water Department across swamp area in 1937; technical details of pipe construction and insulation; main is supported by reinforced concrete beams, stringers and cradles resting on wooden piles.
Maintaining 48-inch main laid across swamp
Water Works Eng
Ankener, R. (Autor:in)
1946
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Sewer laid through swamp on timber grillage
Engineering Index Backfile | 1945
|Building a paved roadway across a swamp
Engineering Index Backfile | 1913
|Building a pile trestle bridge across a swamp
Engineering Index Backfile | 1928
|Repairing a 30-inch submerged water main
Engineering Index Backfile | 1900
|Twelve-inch main pierces 164-foot embankment
Engineering Index Backfile | 1937