Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Railroad tunnels "daylighted" by company forces
Elimination of tunnels on Southern Pacific lines by excavating through overburden to grade was necessary in order to remove restrictive clearances; grading done by railroads own forces; cost figures demonstrated economy of methods; other tunnels eliminated by relocation of main line.
Railroad tunnels "daylighted" by company forces
Elimination of tunnels on Southern Pacific lines by excavating through overburden to grade was necessary in order to remove restrictive clearances; grading done by railroads own forces; cost figures demonstrated economy of methods; other tunnels eliminated by relocation of main line.
Railroad tunnels "daylighted" by company forces
Civ Eng (NY)
Mayo, E.E. (Autor:in)
1946
4 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Daylighted Drainable Base Research
NTIS | 2004
|Elusive challenge of daylighted buildings
NTIS | 1998
|The Hudson River tunnels of the Hudson and Manhattan Railroad Company
Engineering Index Backfile | 1911
|Contrast in daylighted interiors - A method of analysis for designers
British Library Conference Proceedings | 1994
|Tunnels of the Pacific Railroad
ASCE | 2021
|