Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Construction and operation of underfeed stokers
Article deals with single retort, underfeed, bituminous coal stoker in commercial sizes; design and operating details of transmissions, coal feed, air supply, retorts, and coal handling; construction details, size classification, installation, bin feed arrangements, fuel selection and fly ash discussed.
Construction and operation of underfeed stokers
Article deals with single retort, underfeed, bituminous coal stoker in commercial sizes; design and operating details of transmissions, coal feed, air supply, retorts, and coal handling; construction details, size classification, installation, bin feed arrangements, fuel selection and fly ash discussed.
Construction and operation of underfeed stokers
Heating Vent
Steiner, K. (Autor:in)
1945
7 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Draft resistance of underfeed stokers
Engineering Index Backfile | 1921
|Firing of tertiary bituminous coal on underfeed stokers
Engineering Index Backfile | 1930
|Width limitation leads to world's longest underfeed stokers
Engineering Index Backfile | 1932
Firing clayware in intermittent kilns by means of underfeed stokers
Engineering Index Backfile | 1953
|Some factors influencing performance of single retort underfeed stokers
Engineering Index Backfile | 1950
|