Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Steps taken to prevent recurrence of settlement which permitted seawater to cover parts of runways at La Guardia Field in New York, NY, consisted of riprap facing and earth fill dike on sand drain stabilized foundation. (See also - discussion v 77 Separate n D-43 Oct 1951 3 p)
Steps taken to prevent recurrence of settlement which permitted seawater to cover parts of runways at La Guardia Field in New York, NY, consisted of riprap facing and earth fill dike on sand drain stabilized foundation. (See also - discussion v 77 Separate n D-43 Oct 1951 3 p)
Settlement correction at La Guardia Field
Am Soc Civ Engrs -- Proc
Kyle, J.M. (Autor:in)
1950
6 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Settlement Correction at La Guardia Field
ASCE | 2021
|Closure to “Kyle on La Guardia Field”
ASCE | 2021
|Discussion of “Krynine on La Guardia Field”
ASCE | 2021
|La Guardia Airport Ground-Noise Abatement Study
British Library Online Contents | 1994
|