Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Rolled earth main embankment section across left bank flood plain together with rolled earth embankment dam to effect closure of low saddle in reservoir rim on right bank upstream at Center Hill Dam will, upon completion, involve replacement of 2,500,000 cu yd of material; mixing and compacting of fill described.
Rolled earth main embankment section across left bank flood plain together with rolled earth embankment dam to effect closure of low saddle in reservoir rim on right bank upstream at Center Hill Dam will, upon completion, involve replacement of 2,500,000 cu yd of material; mixing and compacting of fill described.
Earthfill placing, Center Hill Dam
Eng News-Rec
McCall, R.W. (Autor:in)
Engineering News-Record ; 138
1947
2 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Europe's highest earthfill dam
Engineering Index Backfile | 1957
Building trio of earthfill dams
Engineering Index Backfile | 1949
Reinstrumentation of an earthfill dam
British Library Online Contents | 1993
|Engineering Index Backfile | 1937
Engineering Index Backfile | 1943
|