Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
With construction of Angostura Dam in South Dakota, first irrigation feature of Missouri Basin Project started; composite concrete and earthfill dam will rise to 160 ft above bed of Cheyenne River and will impound water for irrigation of 16,000 acres.
With construction of Angostura Dam in South Dakota, first irrigation feature of Missouri Basin Project started; composite concrete and earthfill dam will rise to 160 ft above bed of Cheyenne River and will impound water for irrigation of 16,000 acres.
Second Missouri Basin unit started
Western Construction News
Schultz, E.R. (Autor:in)
1947
2 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Lower Marias Unit: Pick-Sloan Missouri Basin Program
NTIS | 2011
|Engineering Index Backfile | 1950
|Missouri River Basin Development
Wiley | 1955
|