Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Clear, precise specifications and contracts invite lower bids
Factors which affect construction costs; example of deficiencies of specifications underlying construction of electrical duct line; another example concerning precast piles reveals that much could have been saved if specification had been adequate; to impose risks on contractor is recognized unfair. (see also Civ Eng (NY) v 17 n 11 Nov 1947 p 36-9, 82)
Clear, precise specifications and contracts invite lower bids
Factors which affect construction costs; example of deficiencies of specifications underlying construction of electrical duct line; another example concerning precast piles reveals that much could have been saved if specification had been adequate; to impose risks on contractor is recognized unfair. (see also Civ Eng (NY) v 17 n 11 Nov 1947 p 36-9, 82)
Clear, precise specifications and contracts invite lower bids
Constructor
Hills, G.B. (Autor:in) / Lovan, C.F. (Autor:in)
Constructor ; 29
1947
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Clear, precise specifications and contracts invite lower bids
Engineering Index Backfile | 1947
|Namibia to invite second round bids
Online Contents | 1994
CONTRACTS - Bids called for Croydon Tramway.
Online Contents | 1995
Online Contents | 2001
|Online Contents | 2000