Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Total length of 150 m is subdivided into 7 spans of 17 m to 28.4 m supported by pile piers; bridge structure consists of steel girders which were launched by means of special launching devices.
Total length of 150 m is subdivided into 7 spans of 17 m to 28.4 m supported by pile piers; bridge structure consists of steel girders which were launched by means of special launching devices.
Reconstruction of Choisy-le Roi railroad bridge in Paris
Le reconstruction du pont de Choisy-le-Roi
Ganon, R. (Autor:in)
Ossature Metallique ; 11
1946
4 pages
Aufsatz (Zeitschrift)
Französisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Reconstruction of bridge at Choisy-le-Roi
Engineering Index Backfile | 1966
|Poesia dell'utile . Choisy-le-Roi Bridge - Jacques Ferrier Architectures
Online Contents | 2011
New shops of the metropolitan railway company of Paris at Porte de Choisy
Engineering Index Backfile | 1931
|Union Pacific Railroad Bridge 60.97 reconstruction
British Library Conference Proceedings | 2008
|Union Pacific Railroad Bridge 60.97 Reconstruction
British Library Conference Proceedings | 2008
|